HS2 completes Bromford Tunnel portal at Washwood Heath from ak buk tunnel com Watch Video
Preview(s):
Gallery
Play Video: (Note: The default playback of the video is HD VERSION. If your browser is buffering the video slowly, please play the REGULAR MP4 VERSION or Open The Video below for better experience. Thank you!)
⏲ Duration: 1:59 👁 View: 570K times ✓ Published: 14-May-2024
Description: Work to build the 3.5 mile Bromford Tunnel bringing high speed trains into Birmingham has taken a leap forward as excavation of the 22 metre deep west portal is completed.
Play Video: (Note: The default playback of the video is HD VERSION. If your browser is buffering the video slowly, please play the REGULAR MP4 VERSION or Open The Video below for better experience. Thank you!)